PLANNING   *   ESTIMATING   *   COORDINATING

CRANE/RIGGING JOBS

SAFELY


PLANNING

Preparation safety procedures at job site:

  1. Consult with company engineers on ground compaction report
  2. Examine the site for electrical hazards
  3. Investigate for possible underground and overhead obstructions
  4. Check for swing clearance
  5. Verify type of material and weight of material to be lifted
  6. Identify and prepare the lay down area if needed
  7. Inform project manager of findings, needs and necessary corrections

ESTIMATING

Proper equipment is essential.

The following determines the type of crane needed:

  1. Type of terrain and where crane is to be positioned
  2. Length of boom required
  3. Distance from job to crane
  4. Distance of lift height

COORDINATING

After determining type of crane:

  • Contact crane rental company and make arrangements
  • Check to see if crane operators license is current
  • Crane log book and crane chart are accessible